Preparation of Feasibility Report
-2×150 MWe Coal Fired Thermal Power Plant
-2×150 MWe Coal Fired Thermal Power Plant
-Translation of technical, administrativeandcommercialdocumentationregardingeverytype of projectsto be used for newly constructed coal or natural gas fired power plants -Translation of technical, administrative and commercial documentation regarding every type of projects to be used for rehabilitation works of coal or natural gas fired power plants
-Our company has been assigned by Minisitery of Industry for the preparation of the executing engineering works for existing Wet Flue Gas Desulphurization plant modernization projects and rehabilitation.
-Feasibility works,conseptual and detail design works and preparation ,evaluation of technical specifications for technical purchase for 3x 133 MWe Yıldızlar Orta Thermal Power Plant project.
Seaş Soma Thermal Power Plant- Unit 3 -Vibration measurement and analysis , inspection of High Pressure and intermediate pressure casings temperature difference with recommendation for 165 MW Turbine in Soma Thermal Power Plant Unit 3 with Doosan Skoda Power Company.